NEWS
President Tinubu’s commissioning: Overview of critical gas infrastructure projects
President Bola Tinubu, marked a significant milestone in Nigeria’s energy sector with the commissioning of three critical gas infrastructure projects.
Here’s an overview:
- ANOH Gas Processing Plant: This state-of-the-art facility boasts a capacity of 300MMscf/d, enhancing Nigeria’s gas processing capabilities and contributing to a more robust energy supply.
-
23.3km Gas Pipeline: A 36-inch pipeline connecting the ANOH Primary Treatment Facility to the OB3 Custody Transfer Metering Station has been commissioned.
This pipeline facilitates efficient transportation of processed gas, ensuring its distribution across various sectors.
- AHL Gas Processing Plant 2: With a capacity of 200MMscf/d, the AHL Gas Processing Plant 2 significantly augments Nigeria’s gas processing infrastructure.
This expansion promises increased gas utilization, driving economic growth and industrial development.
President Tinubu’s commissioning of these projects underscores his commitment to leveraging Nigeria’s abundant gas resources for national development.
These initiatives are poised to catalyze economic growth, create employment opportunities, and propel Nigeria towards energy self-sufficiency.
Overview of the Three (3) Critical Gas Infrastructure Projects Commissioned by President Bola Ahmed Tinubu, (GCFR)
1. 300MMscf/d ANOH Gas Processing Plant.
2. 23.3km, 36-inch Gas Pipeline from the (ANOH Primary Treatment Facility to the OB3 Custody Transfer Metering Station.… pic.twitter.com/qbCFTeXdwr
— NNPC Limited (@nnpclimited) May 15, 2024